303.860.7627 info@luminatellc.com
  • Twitter
  • LinkedIn
  • Twitter
  • LinkedIn
Luminate
  • Company
  • Capabilities
    • Services
    • Industries
  • Media
  • Contact
Select Page

Luminate Serves as Independent Engineer for DESRI’s 37-MW Tobacco Valley Solar Project

by Melissa Ochs | Mar 3, 2020 | Solar

Luminate was pleased to serve as independent engineer in support of D. E. Shaw Renewable Investments, LLC’s Tobacco Valley Solar Farm constructed in Simsbury, Connecticut. The Tobacco Valley Solar Farm is interconnected to Eversource Energy’s 23-kV substation where...

Luminate supports Capital Dynamics’ and 8minute Solar Energy’s solar + storage development

by Melissa Ochs | Jan 29, 2020 | Battery Storage, Solar

Luminate is pleased to have supported Capital Dynamics in establishing its development partnership with 8minute Solar Energy for the Eland solar-plus-storage facility. Upon completion, this 400 MWAC solar and 300 MW/1200 MWh energy storage project will provide record...

Luminate Serves as Independent Engineer for Cordelio Power’s Refinancing of 249-MW Wind and Solar Portfolio in Ontario

by Melissa Ochs | Dec 14, 2018 | Solar, Wind

Luminate provided independent engineering and consulting services for Cordelio Power’s refinancing of a 249-MW portfolio of wind and solar power projects, a rated deal led by BMO Capital Markets and National Bank Financial. The portfolio includes the 149-MW Jericho...

Luminate Serves as Independent Engineer for Origis Energy’s Acquisition of 200 MWAC GA Solar 4 Project

by Melissa Ochs | Oct 29, 2018 | Solar

Luminate provided independent engineering and consulting services for Origis Energy’s procurement of the 200 MWAC GA Solar 4 Project located in Twiggs County, Georgia. It is expected to be one of the largest U.S. solar projects in the southeast. The GA Solar 4...

Luminate Serves as Independent Engineer for SunEnergy1’s 60-MWAC Ranchland Solar Project

by Melissa Ochs | Aug 30, 2018 | Solar

Luminate provided independent engineering and consulting services for SunEnergy1’s 60-MWAC Ranchland Solar Farm. The project was constructed in Currituck County, North Carolina in just three months. Check out the construction time-lapse video here....
Next Entries »

Media Posts

  • Key Takeaways from Wood Mackenzie’s CCUS Conference
  • Connect with Luminate at RE+ 2026 in Las Vegas
  • 2026 Geothermal Rising Conference: Key Trends and Takeaways
  • Twitter
  • LinkedIn

Luminate, LLC 2024 | Designed and Developed by NEWMEDIA.COM