Luminate was pleased to serve as independent engineer in support of Silicon Ranch’s Meridian III Solar Farm constructed near Meridian, Mississippi. The Meridian III Solar Farm is interconnected to Mississippi Power Company’s 230-kV substation where the project is to supply up to 52.5 MWAC of renewable energy.