Luminate is proud to serve as the independent engineer for Origis Energy’s Golden Triangle I project, a 200-MWAC solar photovoltaic power plant with a 50-MWAC/200-MWhAC battery energy storage system in Lowndes County, Mississippi. Origis Energy recently announced that it has secured a tax equity commitment from J.P. Morgan for the Golden Triangle I Solar + Storage project. For more details, check out Origis Energy’s LinkedIn post or visit Origis Energy.
