303.860.7627 info@luminatellc.com
  • Twitter
  • LinkedIn
  • Twitter
  • LinkedIn
Luminate
  • Company
  • Capabilities
    • Services
    • Industries
  • Media
  • Contact
Select Page

Luminate Proud to Serve as Independent Engineer for Optimist Solar + Storage Project

by Melissa Ochs | Jan 7, 2025 | Energy Storage, Solar

Luminate is proud to serve as the Independent Engineer for the Optimist Solar + Storage Project, a 200-MWAC solar facility paired with 50‑MWAC / 200-MWhAC AC-coupled battery energy storage system in Clay County, Mississippi. Expected to be completed in late 2025, this...

Luminate Serves as Independent Engineer for Origis Energy’s Golden Triangle I Project

by Melissa Ochs | Oct 23, 2024 | Energy Storage, Solar

Luminate is proud to serve as the independent engineer for Origis Energy’s Golden Triangle I project, a 200-MWAC solar photovoltaic power plant with a 50-MWAC/200-MWhAC battery energy storage system in Lowndes County, Mississippi. Origis Energy recently announced that...

Luminate Serves as Independent Engineer for Clēnera’s Atrisco Energy Storage Project

by Melissa Ochs | Aug 8, 2024 | Energy Storage

Luminate is pleased to serve as independent engineer for Clēnera’s Atrisco project, a 300-MWAC / 1,200-MWhAC energy storage project located in Rio Rancho, New Mexico. Clēnera reached financial close on the 300-MWAC Atrisco solar project in December 2023, and the...

Luminate Serves as IE on PFI’s 2021 Renewables Deal of the Year

by Melissa Ochs | Mar 25, 2022 | Energy Storage

Luminate proudly served as Independent Engineer for Plus Power’s 185 MW / 565 MWh Kapolei Energy Storage Project, winner of PFI’s 2021 Americas Renewables Deal of the Year!  Find out more news on the award here.   Discover all PFI 2021 award winners! Luminate...

Luminate Serves as Independent Engineer for One of the Largest Solar Projects in Alabama

by Melissa Ochs | Jan 13, 2022 | Energy Storage, Power, Solar

Luminate is pleased to serve as independent engineer for Lightsource bp’s $100 million financing of the 130-megawatt (MWdc) Black Bear Solar energy project to be located in Montgomery County, Alabama. The Black Bear project is expected to be one of Alabama’s largest...

Luminate Serves as Independent Engineer for Plus Power’s 185MW/565 MWh Kapolei Energy Storage Project

by Melissa Ochs | Nov 19, 2021 | Energy Storage, Storage

Luminate is pleased to have served as independent engineer for Plus Power’s 185MW/565 MWh Kapolei Energy Storage (KES) Project. This project is located in Kapolei on the island of Oahu, and is the largest energy storage project selected by Hawaiian Electric in...
« Older Entries
Next Entries »

Media Posts

  • Key Takeaways from Wood Mackenzie’s CCUS Conference
  • Connect with Luminate at RE+ 2026 in Las Vegas
  • 2026 Geothermal Rising Conference: Key Trends and Takeaways
  • Twitter
  • LinkedIn

Luminate, LLC 2024 | Designed and Developed by NEWMEDIA.COM